project plan造句
1、The best person to create a project plan is the person who is responsible for working that plan.
創(chuàng)建項(xiàng)目計(jì)劃的最佳人員是負(fù)責(zé)實(shí)施該計(jì)劃的人員。
2、The project plan is updated and expanded to cover the Construction and Transition phases.
項(xiàng)目計(jì)劃是最新的并且擴(kuò)展到能夠覆蓋到構(gòu)建和產(chǎn)品化階段。
3、Defines and tracks project plan and work breakdown structure.
定義并追蹤項(xiàng)目計(jì)劃與工作分解結(jié)構(gòu)。
4、How do I establish and execute a project plan for a mobile project using DB2 Everyplace?
如果使用DB 2Everyplace為移動(dòng)項(xiàng)目建立和執(zhí)行項(xiàng)目規(guī)劃?
5、The project plan contains the functional specification and a schedule.
項(xiàng)目計(jì)劃包含功能說明(各個(gè)工作組的混合計(jì)劃)和時(shí)間表。
6、Manages work within the project plan framework.
在項(xiàng)目計(jì)劃框架中管理工作。
7、A project plan defines the lifecycle, and the end result is a released application.
項(xiàng)目計(jì)劃定義了生命周期,我們得到的最終結(jié)果是一個(gè)發(fā)布的應(yīng)用程序。
8、The project plan should contain the elements described below.
項(xiàng)目計(jì)劃應(yīng)包含下面所描述的元素。
9、Let's take a look at a very rough movie project plan as an example.
作為一個(gè)例子,讓我們看一看一個(gè)很粗略的電影項(xiàng)目計(jì)劃。
10、Starting with a template project plan is fine; however, every project and environment is different.
從模板項(xiàng)目計(jì)劃開始效果會(huì)很好;但是,每個(gè)項(xiàng)目和環(huán)境都是不同的。
11、We enclose our brief project plan for your perusal.
內(nèi)附我公司項(xiàng)目計(jì)劃概要,請(qǐng)過目。
project plan翻譯
【計(jì)】 項(xiàng)目規(guī)劃, 工程計(jì)劃 詳情

猜你喜歡
- adaptive system造句
- herbert造句
- dividing造句
- achor造句
- really造句
- fairway造句
- haemorrhagic造句
- rupee造句
- weather pattern造句
- myelocytic造句
- suiting造句
- jot造句
- spectroscopy造句
- unbranded造句
- incompleteness造句
- mathematic造句
- alb造句
- close shave造句
- sell-out造句
- unsustainable造句
- heinous造句
- seance造句
- mass balance造句
- downstream造句
- be sorry for造句
- testing time造句
- woodworking造句
- proportional造句
- fluently造句
- keepsake造句
- hitch up造句
- woo造句
- never call造句
- suppressed造句
- synchronal造句
- impermissible造句
- agonist造句
- applied voltage造句
- dissident造句