日本三级无码啪啪区|午夜视频久久一区久久一|AAAAA一级黄片|日本久久99久久|国际精品AV在线|狠狠2015亚洲一区|美腿丝袜亚洲网站|欧美色多多人人看|国产超碰美女在线|www色色在线色

英語造句
位置:首頁>> 英語造句>>mw造句,mw例句

mw造句

1、Application of Symphony DCS to 200 MW Generating Sets
Symphony分散控制系統(tǒng)在200MW機(jī)組上的應(yīng)用

2、Reconstructing experience of ATS in 125 MW power station
125MW電廠ATS改造經(jīng)驗(yàn)

3、Design and Operation of 200 MW Steam Turbines
20萬千瓦汽輪機(jī)的設(shè)計(jì)與運(yùn)行

4、Study of 50 mW high power helium-cadmium white light laser
50毫瓦大功率氦-鎘白光激光器的研究

5、Renovation of Governor of Chen Cun 50 MW Hydro-power Units
陳村50MW水輪發(fā)電機(jī)組調(diào)速器機(jī)械柜改造

6、FCB test for 900 MW supercritical units
900MW超臨界機(jī)組FCB試驗(yàn)

7、Design of Boiler DG 670/140 for 200 MW Power Units
配20萬千瓦機(jī)組的DG670/140型鍋爐的設(shè)計(jì)

8、Application of μXL System in 50 MW Turbine Control
μXL 系統(tǒng)在 50MW 汽輪機(jī)控制中的應(yīng)用

9、Analysis of CCS and BMS Integrated Control of 600 MW Unit
600 MW單元機(jī)組CCS與BMS綜合控制的分析

10、Transformation of Control for 200 MW Generating Set
200MW 機(jī)組熱控改造

11、HP Heater Drainer Vibrating Cause of Soviet-made 210 MW Turbine
俄制210MW汽輪機(jī)高壓加熱器疏水管振動原因

12、Discussion on Defect Treatment of Stator Bar Joints of a 250 MW Generator
250MW發(fā)電機(jī)定子線棒接頭缺陷處理方式探討

13、Application of DEH and BPC Integrated Control in 330 MW Generation Unit
DEH與BPC系統(tǒng)一體化控制在330MW機(jī)組上的應(yīng)用

14、If you increase single unit capacity you can reduce the per MW cost.
如果增加一個(gè)單位的能力,可以降低一兆瓦電的成本

15、Application of Uncoupling Technology to DEH of 200 MW Heat-supply Unit
解耦技術(shù)在200MW供熱機(jī)組DEH中的應(yīng)用

16、Features and Evaluation of MSP Control System of 350 MW Units
350MW機(jī)組主汽壓力全程自動控制系統(tǒng)特點(diǎn)評價(jià)

17、DRM MW and SW Broadcasting Technology
DRM——先進(jìn)技術(shù)與實(shí)施問題

18、Applcation of EE model EP on the boiler of 200 MW power units
EE型電除塵器在200MW機(jī)組上的應(yīng)用

19、A Summary on Applications of 300 MW Unit Coordinated Control System(CCS)
300MW機(jī)組協(xié)調(diào)控制系統(tǒng)構(gòu)成與應(yīng)用

20、500 MW Supercritical Monotube Boiler of The Poryong Power Station in Korea
韓國波陽電站500MW超臨界直流鍋爐

21、Statistic Analysis of Unreliable Factors Based on Spot Data of 300 MW Unit
基于現(xiàn)場數(shù)據(jù)的300MW機(jī)組不可靠性因素統(tǒng)計(jì)分析

22、MW Elizabeth, would you agree with that?
MW伊麗莎白,你同意這種看法嗎?

23、Efficiency increasing reform for ESP of 350 MW unit
大連電廠2號爐350MW機(jī)組電除塵器增效改造

24、plication of DEH-ⅢA control system in home-made 300 MW steam turbine unit
國產(chǎn)300MW汽輪機(jī)組DEH-ⅢA控制系統(tǒng)的應(yīng)用

25、Temperature Profiles Calculation of LP Inner-case for 125 MW Steam Turbine
125MW汽輪機(jī)低壓缸體溫度場計(jì)算

26、Retrofitting of ETS System for Domestic 300 MW Units
國產(chǎn)300MW機(jī)組危急遮斷系統(tǒng)(ETS)的改造

27、DEH Upgrading of First Soviet-made 200 MW Turbine Generator in China
我國首臺蘇制200MW汽輪機(jī)DEH技術(shù)改造

28、Safety Study on Blade Running at Low Vacume of 50 MW HP Turbine
50MW高壓汽輪機(jī)組低真空運(yùn)行葉片安全性研究

29、The 10 MW high temperature gas cooled reactor reached critical in the end of 2000 in China.
MW高溫氣冷實(shí)驗(yàn)堆(HTR-10 )于2 0 0 0年底在中國建成并實(shí)現(xiàn)臨界,是一項(xiàng)重大的科研成果。

30、START-UP AND OPERATION OF 600 MW SUPERCRITICAL TURBINE GENERATOR UNITS
超臨界600MW汽輪發(fā)電機(jī)組的啟動與運(yùn)行

mw翻譯

【計(jì)】 毫瓦 詳情
0
糾錯(cuò)
手機(jī)版 mw造句 單詞乎 www.22a6.cn